Resource details

File name: REMI GTFS
Format: GTFS
Size: 10.94 MB

Offre théorique de transport du réseau interurbain Région Centre Val de Loire REMI - GTFS

This resource file is part of the dataset Réseau interurbain Rémi.

It is valid from 2026-07-17 to 2027-05-18.

  • calendar span by network:
    Rémi 36 from 2026-07-17 to 2026-08-30 Rémi 18 from 2026-07-17 to 2026-08-30 Rémi 28 from 2026-07-17 to 2026-08-31 Rémi 37 from 2026-07-17 to 2026-10-18 Rémi 41 from 2026-07-17 to 2027-02-28 Rémi 45 from 2026-07-17 to 2027-05-18
  • transport mode : bus
  • number of routes: 150
  • number of stop points: 3,416
  • number of stop areas: 2,000

The following table displays if the file/field is present in the GTFS.

Description File or field Status Quantity
Stop accessibility stops.txtwheelchair_boarding 3,089
Trip accessibility trips.txtwheelchair_accessible 2,969
Line short name or line number routes.txtroute_short_name 150
Line long name routes.txtroute_long_name 150
Line color routes.txtroute_color 145
Trip headsign trips.txttrip_headsign 3,894
The possibility of carrying a bicycle in the vehicle trips.txtbikes_allowed 1,092
Trip shapes shapes.txt 3,894
Fare attributes fare_attributes.txt 0
Fare rules fare_rules.txt 0
Fare products fare_products.txt 0
Fare media fare_media.txt 0
Transfers transfers.txt 0
On-demand transport stop_times.txtpickup_type, drop_off_type

Download availability

2026-06-20
100%
2026-06-21
100%
2026-06-22
100%
2026-06-23
100%
2026-06-24
75.9%
2026-06-25
88.9%
2026-06-26
100%
2026-06-27
100%
2026-06-28
100%
2026-06-29
100%
2026-06-30
100%
2026-07-01
100%
2026-07-02
100%
2026-07-03
100%
2026-07-04
100%
2026-07-05
100%
2026-07-06
100%
2026-07-07
100%
2026-07-08
100%
2026-07-09
100%
2026-07-10
100%
2026-07-11
100%
2026-07-12
100%
2026-07-13
100%
2026-07-14
100%
2026-07-15
100%
2026-07-16
100%
2026-07-17
100%
2026-07-18
100%
2026-07-19
100%
2026-07-20
100%
Learn more
We test this resource download availability every hour by making an HTTP HEAD request with a timeout of 5 seconds. If we detect a downtime, we perform subsequent tests every 10 minutes, until the resource is back online.

For SIRI and SIRI Lite feeds, we perform a GET request: a 401 or 405 status code is considered successful. In case of HTTP 500, the feed will be considered unavailable, unless the body appears to contain SOAP.

Stops and routes visualization of the GTFS file

Visualization up-to-date 4 hours and 57 minutes ago.

Validation report

Object type Object ID Object name Related object ID Details
Calendar REMI37:Timetable:CVLMobilité_Sa_07-07-2025/03-10-2026 2026-07-17—2026-10-03
    Calendar REMI37:Timetable:CVLMobilité_02-09-2024/03-10-2026 2026-07-17—2026-10-03
      Stop REMI36:StopPlace:COM_MÉZIÈint Inters. D925/D15
        Stop REMI_18:StopPlace:S_BRÉCYbg1 Bourg

          Validation carried out using the current GTFS file the 2026-07-20 at 02:15 Europe/Paris using the PAN GTFS validator.

          Other resources