Resource details

File name: GTFS Aléop
Format: GTFS
Size: 14.12 MB

GTFS Aléop - Pays de la Loire complet

This resource file is part of the dataset Réseau interurbain Aléop - Pays de la Loire.

It is valid from 2025-09-01 to 2027-07-02.

  • calendar span by network:
    Aléop Lignes Express régionales from 2026-06-27 to 2026-12-12 Aléop Yeu-Continent from 2025-09-01 to 2026-12-31 Aléop en Vendée from 2026-07-04 to 2027-07-02 Aléop en Sarthe from 2025-09-01 to 2027-07-02 Aléop en Mayenne from 2025-09-01 to 2027-07-02 Aléop en Maine-et-Loire from 2026-07-04 to 2027-07-02 Aléop en Loire-Atlantique from 2026-07-04 to 2027-07-02
  • transport modes : bus, ferry
  • number of routes: 149
  • number of stop points: 5,968
  • number of stop areas: 3,804

The following table displays if the file/field is present in the GTFS.

Description File or field Status Quantity
Stop accessibility stops.txtwheelchair_boarding 8,432
Trip accessibility trips.txtwheelchair_accessible 5,131
Line short name or line number routes.txtroute_short_name 149
Line long name routes.txtroute_long_name 149
Line color routes.txtroute_color 149
Trip headsign trips.txttrip_headsign 8,561
The possibility of carrying a bicycle in the vehicle trips.txtbikes_allowed 5,038
Trip shapes shapes.txt 8,539
Fare attributes fare_attributes.txt 3
Fare rules fare_rules.txt 0
Fare products fare_products.txt 0
Fare media fare_media.txt 0
Transfers transfers.txt 106
On-demand transport stop_times.txtpickup_type, drop_off_type

Download availability

2026-07-08
100%
2026-07-09
100%
2026-07-10
100%
2026-07-11
100%
2026-07-12
100%
2026-07-13
100%
2026-07-14
100%
2026-07-15
100%
2026-07-16
100%
2026-07-17
100%
2026-07-18
100%
2026-07-19
100%
2026-07-20
100%
2026-07-21
100%
2026-07-22
100%
2026-07-23
100%
2026-07-24
100%
2026-07-25
100%
2026-07-26
100%
2026-07-27
100%
2026-07-28
100%
2026-07-29
100%
2026-07-30
100%
2026-07-31
100%
2026-08-01
100%
2026-08-02
100%
2026-08-03
100%
2026-08-04
100%
2026-08-05
100%
2026-08-06
100%
2026-08-07
100%
Learn more
We test this resource download availability every hour by making an HTTP HEAD request with a timeout of 5 seconds. If we detect a downtime, we perform subsequent tests every 10 minutes, until the resource is back online.

For SIRI and SIRI Lite feeds, we perform a GET request: a 401 or 405 status code is considered successful. In case of HTTP 500, the feed will be considered unavailable, unless the body appears to contain SOAP.

Stops and routes visualization of the GTFS file

Visualization up-to-date 3 hours and 44 minutes ago.

Validation report

Object type Object ID Object name Related object ID Details
Stop 49ANCEhôpiR Hôpital
    Stop AST-44ANCEhopiU-49ANCEhôpiA-49ANCEhôpiR Hôpital
      Stop 49ANCEhôpiA Hôpital
        Stop 49ANGEclémA Clémenceau
          Stop 49ANGEclémR Clémenceau
            Stop 49ANGEclém Clémenceau

              Validation carried out using the current GTFS file the 2026-08-07 at 08:22 Europe/Paris using the PAN GTFS validator.

              Other resources