Resource details
File name:
KorriGo - Fichier GTFS
Format: GTFS
Size: 65.23 MB
KorriGo - Fichier GTFS
This resource file is part of the dataset Agrégat de réseaux urbains et interurbains de Bretagne.
It is valid from 2025-04-19 to 2026-01-01.
-
calendar span by network:Liaisons maritimes Morbihan from 2025-04-19 to 2025-04-30 STAR (Rennes Métropole) from 2025-04-19 to 2025-05-06 Bibus (Brest Métropole) from 2025-04-19 to 2025-06-22 Distribus (Lamballe Terre & Mer) from 2025-04-19 to 2025-06-28 Izilo (Lorient Agglomération) from 2025-04-19 to 2025-06-29 Linéotim (Morlaix urbain) from 2025-04-19 to 2025-07-03 Tud'Bus (Douarnenez Communauté) from 2025-04-19 to 2025-07-04 Réseau Coralie (Concarneau Cornouaille Agglomération) from 2025-04-19 to 2025-07-04 MAT (St Malo Agglomération) from 2025-04-19 to 2025-07-04 BreizhGo en Morbihan from 2025-04-19 to 2025-07-04 BreizhGo en Ille-et-Vilaine from 2025-04-19 to 2025-07-04 TBK (Quimperlé) from 2025-04-19 to 2025-07-05 BreizhGo en Finistère from 2025-04-19 to 2025-07-05 TILT (Lannion) from 2025-04-19 to 2025-07-06 LinéotimL30 (Morlaix) from 2025-04-19 to 2025-07-06 Linéotim (Morlaix périurbain) from 2025-04-19 to 2025-07-06 Liaison maritime Arz from 2025-04-19 to 2025-07-06 TER BreizhGo from 2025-04-19 to 2025-07-19 SURF (Fougères) from 2025-04-19 to 2025-08-30 RIV (Ploërmel) from 2025-04-19 to 2025-08-30 PondiBUS et MOOVI (Pontivy) from 2025-04-19 to 2025-08-30 Ar Bus (Communauté de Communes du Pays de Landerneau-Daoulas) from 2025-04-19 to 2025-08-30 TUB (St Brieuc Agglomération) from 2025-04-19 to 2025-08-31 QUB (Quimper urbain) from 2025-04-19 to 2025-08-31 BreizhGo Lignes Ouest-Nord from 2025-04-19 to 2025-08-31 BreizhGo Ligne Nord-Sud from 2025-04-19 to 2025-08-31 Guingamp-Paimpol Mobilité from 2025-04-19 to 2025-11-11 Kicéo (Vannes Agglomération) from 2025-04-19 to 2025-12-25 Liaisons maritimes Finistère from 2025-04-19 to 2025-12-31 Finist'Air from 2025-04-19 to 2025-12-31 BreizhGo en Côtes d'Armor from 2025-04-19 to 2025-12-31 Auray Bus (Auray) from 2025-04-19 to 2026-01-01
- transport modes : bus, ferry, tramway, gondola, coach, rail, subway
- number of routes: 1,024
- number of stop points: 15,982
- number of stop areas: 0
The following table displays if the file/field is present in the GTFS.
Description | File or field | Status | Quantity |
---|---|---|---|
Stop accessibility | stops.txt — wheelchair_boarding |
✅ | 5,540 |
Trip accessibility | trips.txt — wheelchair_accessible |
✅ | 81,480 |
Line short name or line number | routes.txt — route_short_name |
✅ | 935 |
Line long name | routes.txt — route_long_name |
✅ | 1,024 |
Line color | routes.txt — route_color |
✅ | 909 |
Trip headsign | trips.txt — trip_headsign |
❌ | 0 |
The possibility of carrying a bicycle in the vehicle | trips.txt — bikes_allowed |
❌ | 0 |
Trip shapes | shapes.txt |
✅ | 103,348 |
Fare attributes | fare_attributes.txt |
❌ | 0 |
Fare rules | fare_rules.txt |
❌ | 0 |
Transfers | transfers.txt |
✅ | 25,196 |
On-demand transport | stop_times.txt — pickup_type , drop_off_type |
✅ |
This resource is also available in the following formats:
* GeoJSON format contains only the spatial information of the resource (stops coordinates, eventually lines shapes)
It corresponds to the data you can see on the map below.
This GeoJSON was up-to-date with the GTFS resource 5 hours and 36 minutes ago.
Download availability
2025-03-20
100%
2025-03-21
100%
2025-03-22
100%
2025-03-23
100%
2025-03-24
100%
2025-03-25
100%
2025-03-26
100%
2025-03-27
100%
2025-03-28
100%
2025-03-29
100%
2025-03-30
100%
2025-03-31
100%
2025-04-01
100%
2025-04-02
100%
2025-04-03
100%
2025-04-04
100%
2025-04-05
100%
2025-04-06
100%
2025-04-07
100%
2025-04-08
100%
2025-04-09
100%
2025-04-10
100%
2025-04-11
100%
2025-04-12
100%
2025-04-13
100%
2025-04-14
100%
2025-04-15
100%
2025-04-16
100%
2025-04-17
100%
2025-04-18
100%
2025-04-19
100%
Learn more
We test this resource download availability every hour by making an HTTP
For SIRI and SIRI Lite feeds, we perform a
HEAD
request with a timeout of 5 seconds. If we detect a downtime, we perform subsequent tests every 10 minutes, until the resource is back online.For SIRI and SIRI Lite feeds, we perform a
GET
request: a 401 or 405 status code is considered successful. In case of HTTP 500, the feed will be considered unavailable, unless the body appears to contain SOAP.Stops and routes visualization of the GTFS file
Visualization up-to-date 5 hours and 36 minutes ago.
Validation report
Impacted file: stop_times.txt
The speed between two consecutive stops do not seem credible
Stop ID | Stop name | Next stop and service | Details |
---|---|---|---|
TUB:20526 | Moulin à Papier |
|
travel duration is null, but there are 524 meters between the stops |
CORALIE:StopPoint_CORNav289 | Kroaz Hent Kergoz |
|
travel duration is null, but there are 2888 meters between the stops |
TBK:rieloct2 | Croaz Hent Loctudy |
|
travel duration is null, but there are 539 meters between the stops |
CTRL:KYVT1 | Keryvonet |
|
travel duration is null, but there are 519 meters between the stops |
TUB:21354 | Ville Neuve |
|
travel duration is null, but there are 587 meters between the stops |
PENNARBED:512931 | Moulin du Pont |
|
travel duration is null, but there are 568 meters between the stops |
CORALIE:StopPoint_CORNav204 | Kerléan |
|
travel duration is null, but there are 742 meters between the stops |
QUB:guekerm0 | Kermaria |
|
travel duration is null, but there are 728 meters between the stops |
TUB:20896 | Ville au Bourg |
|
travel duration is null, but there are 522 meters between the stops |
TBK:qurcent1 | Centre |
|
travel duration is null, but there are 897 meters between the stops |
MAT:1561 | Roche |
|
travel duration is null, but there are 1939 meters between the stops |
TIBUS:CLN4A2 | Croisement D62 |
|
travel duration is null, but there are 609 meters between the stops |
PENNARBED:512943 | Kerleusquenet |
|
travel duration is null, but there are 539 meters between the stops |
PENNARBED:13732 | Prat an Dour |
|
travel duration is null, but there are 722 meters between the stops |
TBK:clocent1 | Le Pouldu Centre |
|
travel duration is null, but there are 549 meters between the stops |
MAT:1389 | Le Fougeray |
|
travel duration is null, but there are 5706 meters between the stops |
PENNARBED:513406 | Penker Ar Bloas |
|
travel duration is null, but there are 1828 meters between the stops |
TUB:21360 | Champs Rio |
|
travel duration is null, but there are 561 meters between the stops |
TBK:bangare1 | Gare SNCF |
|
travel duration is null, but there are 875 meters between the stops |
TBK:moermen2 | Kermen |
|
travel duration is null, but there are 509 meters between the stops |
Validation carried out using the current GTFS file the 2025-04-19 at 08:08 Europe/Paris using the PAN GTFS validator.