Resource details
File name:
KorriGo - Fichier GTFS
Format: GTFS
Size: 69.74 MB
KorriGo - Fichier GTFS
This resource file is part of the dataset Agrégat de réseaux urbains et interurbains de Bretagne.
It is valid from 2025-06-05 to 2026-03-31.
-
calendar span by network:STAR (Rennes Métropole) from 2025-06-05 to 2025-06-19 Izilo (Lorient Agglomération) from 2025-06-05 to 2025-06-29 Liaisons maritimes Morbihan from 2025-06-05 to 2025-06-30 Linéotim (Morlaix urbain) from 2025-06-05 to 2025-07-03 BreizhGo en Morbihan from 2025-06-05 to 2025-07-04 MAT (St Malo Agglomération) from 2025-06-05 to 2025-07-04 Réseau Coralie (Concarneau Cornouaille Agglomération) from 2025-06-05 to 2025-07-04 BreizhGo en Ille-et-Vilaine from 2025-06-05 to 2025-07-04 Tud'Bus (Douarnenez Communauté) from 2025-06-05 to 2025-07-04 BreizhGo en Finistère from 2025-06-05 to 2025-07-05 TBK (Quimperlé) from 2025-06-05 to 2025-07-05 Linéotim (Morlaix périurbain) from 2025-06-05 to 2025-07-06 TILT (Lannion) from 2025-06-05 to 2025-07-06 Liaison maritime Arz from 2025-06-05 to 2025-07-06 Bibus (Brest Métropole) from 2025-06-05 to 2025-07-06 LinéotimL30 (Morlaix) from 2025-06-05 to 2025-07-06 PondiBUS et MOOVI (Pontivy) from 2025-06-05 to 2025-08-30 SURF (Fougères) from 2025-06-05 to 2025-08-30 RIV (Ploërmel) from 2025-06-05 to 2025-08-30 Ar Bus (Communauté de Communes du Pays de Landerneau-Daoulas) from 2025-06-05 to 2025-08-30 TUB (St Brieuc Agglomération) from 2025-06-05 to 2025-08-31 Guingamp-Paimpol Mobilité from 2025-06-05 to 2025-08-31 QUB (Quimper urbain) from 2025-06-05 to 2025-08-31 Distribus (Lamballe Terre & Mer) from 2025-06-05 to 2025-08-31 BreizhGo Lignes Ouest-Nord from 2025-06-05 to 2025-08-31 BreizhGo Ligne Nord-Sud from 2025-06-05 to 2025-08-31 TER BreizhGo from 2025-06-05 to 2025-09-03 Belle Île Bus (Belle île en mer) from 2025-06-05 to 2025-11-02 Kicéo (Vannes Agglomération) from 2025-06-05 to 2025-12-25 BreizhGo en Côtes d'Armor from 2025-06-05 to 2025-12-31 Finist'Air from 2025-06-05 to 2025-12-31 Liaisons maritimes Finistère from 2025-06-05 to 2025-12-31 Auray Bus (Auray) from 2025-06-05 to 2026-01-01 Liaison maritime Bréhat from 2025-06-05 to 2026-03-31
- transport modes : bus, ferry, tramway, gondola, coach, rail, subway
- number of routes: 1,045
- number of stop points: 16,114
- number of stop areas: 0
The following table displays if the file/field is present in the GTFS.
Description | File or field | Status | Quantity |
---|---|---|---|
Stop accessibility | stops.txt — wheelchair_boarding |
✅ | 5,552 |
Trip accessibility | trips.txt — wheelchair_accessible |
✅ | 87,637 |
Line short name or line number | routes.txt — route_short_name |
✅ | 956 |
Line long name | routes.txt — route_long_name |
✅ | 1,045 |
Line color | routes.txt — route_color |
✅ | 932 |
Trip headsign | trips.txt — trip_headsign |
❌ | 0 |
The possibility of carrying a bicycle in the vehicle | trips.txt — bikes_allowed |
❌ | 0 |
Trip shapes | shapes.txt |
✅ | 104,816 |
Fare attributes | fare_attributes.txt |
❌ | 0 |
Fare rules | fare_rules.txt |
❌ | 0 |
Transfers | transfers.txt |
✅ | 25,356 |
On-demand transport | stop_times.txt — pickup_type , drop_off_type |
✅ |
This resource is also available in the following formats:
* GeoJSON format contains only the spatial information of the resource (stops coordinates, eventually lines shapes)
It corresponds to the data you can see on the map below.
This GeoJSON was up-to-date with the GTFS resource 2 hours and 26 minutes ago.
Download availability
2025-05-06
100%
2025-05-07
100%
2025-05-08
100%
2025-05-09
100%
2025-05-10
100%
2025-05-11
100%
2025-05-12
100%
2025-05-13
100%
2025-05-14
100%
2025-05-15
100%
2025-05-16
100%
2025-05-17
100%
2025-05-18
100%
2025-05-19
100%
2025-05-20
100%
2025-05-21
100%
2025-05-22
100%
2025-05-23
100%
2025-05-24
100%
2025-05-25
100%
2025-05-26
100%
2025-05-27
100%
2025-05-28
100%
2025-05-29
100%
2025-05-30
100%
2025-05-31
100%
2025-06-01
100%
2025-06-02
100%
2025-06-03
100%
2025-06-04
100%
2025-06-05
100%
Learn more
We test this resource download availability every hour by making an HTTP
For SIRI and SIRI Lite feeds, we perform a
HEAD
request with a timeout of 5 seconds. If we detect a downtime, we perform subsequent tests every 10 minutes, until the resource is back online.For SIRI and SIRI Lite feeds, we perform a
GET
request: a 401 or 405 status code is considered successful. In case of HTTP 500, the feed will be considered unavailable, unless the body appears to contain SOAP.Stops and routes visualization of the GTFS file
Visualization up-to-date 2 hours and 26 minutes ago.
Validation report
Impacted file: stop_times.txt
The speed between two consecutive stops do not seem credible
Stop ID | Stop name | Next stop and service | Details |
---|---|---|---|
TIBUS:SJU3A2 | Centre |
|
computed speed between the stops is 124.46 km/h (2074 m travelled in 60 seconds) |
TIBUS:TGU6A1 | Croaz Hent |
|
computed speed between the stops is 137.70 km/h (2295 m travelled in 60 seconds) |
PENNARBED:2901512 | Giratoire Kerdalaës |
|
computed speed between the stops is 217.25 km/h (3621 m travelled in 60 seconds) |
TIBUS:SPO5A2 | Terrain des Sports |
|
computed speed between the stops is 150.02 km/h (2500 m travelled in 60 seconds) |
TIM:SAEIVGESTC.3 | Maréchal Leclerc |
|
computed speed between the stops is 122.17 km/h (4072 m travelled in 120 seconds) |
CORALIE:StopPoint_CORNav806 | Kerleun |
|
computed speed between the stops is 124.29 km/h (2071 m travelled in 60 seconds) |
MAT:1437 | Libération |
|
computed speed between the stops is 159.57 km/h (2659 m travelled in 60 seconds) |
MAT:1372 | Le Boussou |
|
computed speed between the stops is 143.92 km/h (2399 m travelled in 60 seconds) |
MAT:1647 | Ville ès Gris |
|
computed speed between the stops is 504.77 km/h (8413 m travelled in 60 seconds) |
MAT:1480 | Moulin |
|
computed speed between the stops is 216.94 km/h (3616 m travelled in 60 seconds) |
MAT:1389 | Le Fougeray |
|
computed speed between the stops is 171.17 km/h (5706 m travelled in 120 seconds) |
MAT:1261 | La Beuglais |
|
computed speed between the stops is 221.65 km/h (3694 m travelled in 60 seconds) |
MAT:1641 | Vieux Bourg |
|
computed speed between the stops is 196.09 km/h (3268 m travelled in 60 seconds) |
PENNARBED:512340 | Sainte-Evette Embarcadère |
|
computed speed between the stops is 134.50 km/h (4483 m travelled in 120 seconds) |
PABMAR:5 | Gare maritime LE CONQUET |
|
computed speed between the stops is 833.00 km/h (13883 m travelled in 60 seconds) |
MAT:1395 | Le Mesnil |
|
computed speed between the stops is 145.56 km/h (2426 m travelled in 60 seconds) |
MAT:1555 | Restos du Coeur |
|
computed speed between the stops is 174.10 km/h (2902 m travelled in 60 seconds) |
PABMAR:2 | Gare maritime MOLENE |
|
computed speed between the stops is 625.11 km/h (10418 m travelled in 60 seconds) |
PENNARBED:chouette:StopArea:ad7ba75c-9aae-4876-918d-32eebdfc75e8:LOC | Bourg |
|
computed speed between the stops is 145.59 km/h (7280 m travelled in 180 seconds) |
MAT:1403 | Centre |
|
computed speed between the stops is 528.40 km/h (8807 m travelled in 60 seconds) |
Validation carried out using the current GTFS file the 2025-06-05 at 20:13 Europe/Paris using the PAN GTFS validator.