Resource details
File name:
KorriGo - Fichier GTFS
Format: GTFS
Size: 48.63 MB
KorriGo - Fichier GTFS
This resource file is part of the dataset Agrégat des réseaux urbains et interurbains de Bretagne.
It is valid from 2025-07-22 to 2026-07-03.
-
calendar span by network:STAR (Rennes Métropole) from 2025-07-22 to 2025-08-01 Liaison maritime Arz from 2025-07-22 to 2025-08-24 Linéotim (Morlaix urbain) from 2025-07-22 to 2025-08-30 PondiBUS et MOOVI (Pontivy) from 2025-07-22 to 2025-08-30 SURF (Fougères) from 2025-07-22 to 2025-08-30 Tud'Bus (Douarnenez Communauté) from 2025-07-22 to 2025-08-30 RIV (Ploërmel) from 2025-07-22 to 2025-08-30 Ar Bus (Communauté de Communes du Pays de Landerneau-Daoulas) from 2025-07-22 to 2025-08-30 BreizhGo en Morbihan from 2025-07-22 to 2025-08-31 Izilo (Lorient Agglomération) from 2025-07-22 to 2025-08-31 MAT (St Malo Agglomération) from 2025-07-22 to 2025-08-31 Réseau Coralie (Concarneau Cornouaille Agglomération) from 2025-07-22 to 2025-08-31 TUB (St Brieuc Agglomération) from 2025-07-22 to 2025-08-31 Guingamp-Paimpol Mobilité from 2025-07-22 to 2025-08-31 Linéotim (Morlaix périurbain) from 2025-07-22 to 2025-08-31 TILT (Lannion) from 2025-07-22 to 2025-08-31 BreizhGo en Ille-et-Vilaine from 2025-07-22 to 2025-08-31 QUB (Quimper urbain) from 2025-07-22 to 2025-08-31 Bibus (Brest Métropole) from 2025-07-22 to 2025-08-31 Distribus (Lamballe Terre & Mer) from 2025-07-22 to 2025-08-31 BreizhGo Lignes Ouest-Nord from 2025-07-22 to 2025-08-31 LinéotimL30 (Morlaix) from 2025-07-22 to 2025-08-31 Liaisons maritimes Morbihan from 2025-07-22 to 2025-08-31 BreizhGo Ligne Nord-Sud from 2025-07-22 to 2025-08-31 TER BreizhGo from 2025-07-22 to 2025-10-21 TBK (Quimperlé) from 2025-07-22 to 2025-10-31 Belle Île Bus (Belle île en mer) from 2025-07-22 to 2025-11-02 Kicéo (Vannes Agglomération) from 2025-07-27 to 2025-12-25 BreizhGo en Côtes d'Armor from 2025-07-22 to 2025-12-31 Finist'Air from 2025-07-22 to 2025-12-31 Liaisons maritimes Finistère from 2025-07-22 to 2025-12-31 Auray Bus (Auray) from 2025-07-22 to 2026-01-01 Liaison maritime Bréhat from 2025-07-22 to 2026-03-31 BreizhGo en Finistère from 2025-07-22 to 2026-07-03
- transport modes : bus, ferry, tramway, gondola, coach, rail, subway
- number of routes: 1,027
- number of stop points: 12,410
- number of stop areas: 0
The following table displays if the file/field is present in the GTFS.
Description | File or field | Status | Quantity |
---|---|---|---|
Stop accessibility | stops.txt — wheelchair_boarding |
✅ | 4,675 |
Trip accessibility | trips.txt — wheelchair_accessible |
✅ | 61,582 |
Line short name or line number | routes.txt — route_short_name |
✅ | 937 |
Line long name | routes.txt — route_long_name |
✅ | 1,027 |
Line color | routes.txt — route_color |
✅ | 910 |
Trip headsign | trips.txt — trip_headsign |
❌ | 0 |
The possibility of carrying a bicycle in the vehicle | trips.txt — bikes_allowed |
❌ | 0 |
Trip shapes | shapes.txt |
✅ | 76,070 |
Fare attributes | fare_attributes.txt |
❌ | 0 |
Fare rules | fare_rules.txt |
❌ | 0 |
Transfers | transfers.txt |
✅ | 19,956 |
On-demand transport | stop_times.txt — pickup_type , drop_off_type |
✅ |
This resource is also available in the following formats:
* GeoJSON format contains only the spatial information of the resource (stops coordinates, eventually lines shapes)
It corresponds to the data you can see on the map below.
This GeoJSON was up-to-date with the GTFS resource 33 minutes ago.
Download availability
2025-06-22
100%
2025-06-23
100%
2025-06-24
100%
2025-06-25
100%
2025-06-26
100%
2025-06-27
100%
2025-06-28
100%
2025-06-29
100%
2025-06-30
100%
2025-07-01
100%
2025-07-02
100%
2025-07-03
100%
2025-07-04
100%
2025-07-05
100%
2025-07-06
100%
2025-07-07
100%
2025-07-08
100%
2025-07-09
100%
2025-07-10
100%
2025-07-11
100%
2025-07-12
100%
2025-07-13
100%
2025-07-14
100%
2025-07-15
100%
2025-07-16
100%
2025-07-17
100%
2025-07-18
100%
2025-07-19
100%
2025-07-20
100%
2025-07-21
100%
2025-07-22
100%
Learn more
We test this resource download availability every hour by making an HTTP
For SIRI and SIRI Lite feeds, we perform a
HEAD
request with a timeout of 5 seconds. If we detect a downtime, we perform subsequent tests every 10 minutes, until the resource is back online.For SIRI and SIRI Lite feeds, we perform a
GET
request: a 401 or 405 status code is considered successful. In case of HTTP 500, the feed will be considered unavailable, unless the body appears to contain SOAP.Stops and routes visualization of the GTFS file
Visualization up-to-date 33 minutes ago.
Validation report
Impacted file: stop_times.txt
The speed between two consecutive stops do not seem credible
Stop ID | Stop name | Next stop and service | Details |
---|---|---|---|
TBK:clostja1 | Saint-Jacques Clohars |
|
travel duration is null, but there are 515 meters between the stops |
ARBUS:14 | La Bascule |
|
travel duration is null, but there are 549 meters between the stops |
PENNARBED:PNZ1A1 | Bourg |
|
travel duration is null, but there are 6964 meters between the stops |
PENNARBED:CTL4B3 | Echangeur du Pouillot |
|
travel duration is null, but there are 2926 meters between the stops |
TBK:rieloud2 | Place Loudoux |
|
travel duration is null, but there are 582 meters between the stops |
TBK:ptagare1 | gare |
|
travel duration is null, but there are 668 meters between the stops |
PENNARBED:DLS6A1 | Reun ar Moal |
|
travel duration is null, but there are 1716 meters between the stops |
TBK:quista2 | Stang an Aman |
|
travel duration is null, but there are 1064 meters between the stops |
TBK:clorgau2 | Doëlan rive gauche |
|
travel duration is null, but there are 561 meters between the stops |
BIBUS:BARBE_2 | Ste Barbe |
|
travel duration is null, but there are 623 meters between the stops |
PENNARBED:POM2A1 | Bourg |
|
travel duration is null, but there are 7945 meters between the stops |
TBK:ptakero1 | Kerose |
|
travel duration is null, but there are 664 meters between the stops |
CTRL:KPIN1 | Kerchopine |
|
travel duration is null, but there are 593 meters between the stops |
PENNARBED:CRZ6D1 | Saint Fiacre |
|
travel duration is null, but there are 5234 meters between the stops |
TBK:banrluc1 | Kerluc |
|
travel duration is null, but there are 564 meters between the stops |
MAT:1459 | Mettrie aux Louets |
|
travel duration is null, but there are 678 meters between the stops |
PENNARBED:TGV1A3 | Bourg |
|
travel duration is null, but there are 5634 meters between the stops |
AURAYBUS:AB6048 | Wilson |
|
travel duration is null, but there are 501 meters between the stops |
CTRL:FPIZ | Foyer Prat Izel |
|
travel duration is null, but there are 1942 meters between the stops |
PENNARBED:LND1A1 | Bourg |
|
travel duration is null, but there are 4893 meters between the stops |
Validation carried out using the current GTFS file the 2025-07-22 at 14:10 Europe/Paris using the PAN GTFS validator.