Resource details
File name:
KorriGo - Fichier GTFS
Format: GTFS
Size: 57.03 MB
KorriGo - Fichier GTFS
This resource file is part of the dataset Agrégat de réseaux urbains et interurbains de Bretagne.
It is valid from 2024-11-30 to 2026-01-01.
-
calendar span by network:Distribus (Lamballe Terre & Mer) from 2024-11-30 to 2024-12-20 BreizhGo en Morbihan from 2024-11-30 to 2024-12-20 STAR (Rennes Métropole) from 2024-11-30 to 2024-12-24 Finist'Air from 2024-11-30 to 2024-12-31 Kicéo (Vannes Agglomération) from 2024-11-30 to 2024-12-31 TUB (St Brieuc Agglomération) from 2024-11-30 to 2024-12-31 Liaison maritime Arz from 2024-11-30 to 2024-12-31 MAT (St Malo Agglomération) from 2024-11-30 to 2024-12-31 Guingamp-Paimpol Mobilité from 2024-11-30 to 2024-12-31 Liaisons maritimes Morbihan from 2024-11-30 to 2024-12-31 Liaisons maritimes Finistère from 2024-11-30 to 2024-12-31 Linéotim (Morlaix urbain) from 2024-11-30 to 2024-12-31 QUB (Quimper urbain) from 2024-11-30 to 2024-12-31 Izilo (Lorient Agglomération) from 2024-11-30 to 2025-01-05 TER BreizhGo from 2024-11-30 to 2025-03-01 Liaison maritime Bréhat from 2024-11-30 to 2025-03-31 Réseau Coralie (Concarneau Cornouaille Agglomération) from 2024-11-30 to 2025-07-04 TBK (Quimperlé) from 2024-11-30 to 2025-07-04 Tud'Bus (Douarnenez Communauté) from 2024-11-30 to 2025-07-04 BreizhGo en Ille-et-Vilaine from 2024-11-30 to 2025-07-04 BreizhGo en Finistère from 2024-11-30 to 2025-07-05 Bibus (Brest Métropole) from 2024-11-30 to 2025-07-06 Linéotim (Morlaix périurbain) from 2024-11-30 to 2025-07-06 TILT (Lannion) from 2024-11-30 to 2025-07-06 LinéotimL30 (Morlaix) from 2024-11-30 to 2025-07-06 RIV (Ploërmel) from 2024-11-30 to 2025-08-30 PondiBUS et MOOVI (Pontivy) from 2024-11-30 to 2025-08-30 SURF (Fougères) from 2024-11-30 to 2025-08-30 Ar Bus (Communauté de Communes du Pays de Landerneau-Daoulas) from 2024-11-30 to 2025-08-30 BreizhGo en Côtes d'Armor from 2024-11-30 to 2025-08-31 BreizhGo Ligne Nord-Sud from 2024-11-30 to 2025-08-31 BreizhGo Lignes Ouest-Nord from 2024-11-30 to 2025-08-31 Auray Bus (Auray) from 2024-11-30 to 2026-01-01
- transport modes : bus, ferry, tramway, gondola, coach, rail, subway
- number of routes: 1,030
- number of stop points: 16,039
- number of stop areas: 0
The following table displays if the file/field is present in the GTFS.
Description | File or field | Status | Quantity |
---|---|---|---|
Stop accessibility | stops.txt — wheelchair_boarding |
✅ | 4,893 |
Trip accessibility | trips.txt — wheelchair_accessible |
✅ | 66,940 |
Line short name or line number | routes.txt — route_short_name |
✅ | 941 |
Line long name | routes.txt — route_long_name |
✅ | 1,030 |
Line color | routes.txt — route_color |
✅ | 912 |
Trip headsign | trips.txt — trip_headsign |
❌ | 0 |
The possibility of carrying a bicycle in the vehicle | trips.txt — bikes_allowed |
❌ | 0 |
Trip shapes | shapes.txt |
✅ | 86,380 |
Fare attributes | fare_attributes.txt |
❌ | 0 |
Fare rules | fare_rules.txt |
❌ | 0 |
Transfers | transfers.txt |
✅ | 25,864 |
On-demand transport | stop_times.txt — pickup_type , drop_off_type |
✅ |
This resource is also available in the following formats:
* GeoJSON format contains only the spatial information of the resource (stops coordinates, eventually lines shapes)
It corresponds to the data you can see on the map below.
This GeoJSON was up-to-date with the GTFS resource 1 hour and 26 minutes ago.
Download availability
2024-10-31
100%
2024-11-01
100%
2024-11-02
100%
2024-11-03
100%
2024-11-04
99.5%
2024-11-05
100%
2024-11-06
100%
2024-11-07
100%
2024-11-08
100%
2024-11-09
100%
2024-11-10
100%
2024-11-11
100%
2024-11-12
100%
2024-11-13
100%
2024-11-14
100%
2024-11-15
100%
2024-11-16
100%
2024-11-17
100%
2024-11-18
100%
2024-11-19
100%
2024-11-20
100%
2024-11-21
100%
2024-11-22
100%
2024-11-23
100%
2024-11-24
100%
2024-11-25
100%
2024-11-26
100%
2024-11-27
100%
2024-11-28
100%
2024-11-29
100%
2024-11-30
100%
Learn more
We test this resource download availability every hour by making an HTTP
For SIRI and SIRI Lite feeds, we perform a
HEAD
request with a timeout of 5 seconds. If we detect a downtime, we perform subsequent tests every 10 minutes, until the resource is back online.For SIRI and SIRI Lite feeds, we perform a
GET
request: a 401 or 405 status code is considered successful. In case of HTTP 500, the feed will be considered unavailable, unless the body appears to contain SOAP.Stops and routes visualization of the GTFS file
Visualization up-to-date 1 hour and 26 minutes ago.
Validation report
Impacted file: stop_times.txt
The speed between two consecutive stops do not seem credible
Stop ID | Stop name | Next stop and service | Details |
---|---|---|---|
QUB:BRIMCVA2 | MENEZ CROAS VAR |
|
computed speed between the stops is 463.17 km/h (15439 m travelled in 120 seconds) |
TIBUS:QDC1A1 | La Prévostais |
|
computed speed between the stops is 166.37 km/h (2773 m travelled in 60 seconds) |
TIM:SAEIV.10 | Le cosquer |
|
computed speed between the stops is 135.81 km/h (2263 m travelled in 60 seconds) |
SNCF:87481705 | Gare de Saint-Nazaire |
|
computed speed between the stops is 39468.02 km/h (5262403 m travelled in 480 seconds) |
TIBUS:SPO5A2 | Terrain des Sports |
|
computed speed between the stops is 150.02 km/h (2500 m travelled in 60 seconds) |
TIBUS:COA2A1 | Lochrist |
|
computed speed between the stops is 219.08 km/h (3651 m travelled in 60 seconds) |
TIM:SAEIVGESTC.105 | Place Foch |
|
computed speed between the stops is 122.76 km/h (6138 m travelled in 180 seconds) |
TIM:SAEIVGESTC.3 | Maréchal Leclerc |
|
computed speed between the stops is 122.17 km/h (4072 m travelled in 120 seconds) |
PENNARBED:2901511 | Giratoire Kerdalaës |
|
computed speed between the stops is 217.74 km/h (3629 m travelled in 60 seconds) |
PENNARBED:03611 | Eglise |
|
computed speed between the stops is 281.26 km/h (37501 m travelled in 480 seconds) |
PABMAR:4 | Gare maritime de BREST |
|
computed speed between the stops is 2586.52 km/h (43109 m travelled in 60 seconds) |
SNCF:87396028 | Gare de Neuville |
|
computed speed between the stops is 53452.36 km/h (5345236 m travelled in 360 seconds) |
TIBUS:PLD3A1 | Kerantour |
|
computed speed between the stops is 169.51 km/h (2825 m travelled in 60 seconds) |
SNCF:87481721 | Gare de Donges |
|
computed speed between the stops is 63192.53 km/h (5266044 m travelled in 300 seconds) |
TIBUS:HEN1A1 | Centre |
|
computed speed between the stops is 124.37 km/h (2073 m travelled in 60 seconds) |
CORALIE:StopPoint_CORNav754 | Kerleun |
|
computed speed between the stops is 124.29 km/h (2071 m travelled in 60 seconds) |
TIBUS:CRS6A2 | Tréfort |
|
computed speed between the stops is 133.10 km/h (2218 m travelled in 60 seconds) |
TBK:riepont1 | Pont du Guilly |
|
computed speed between the stops is 143.46 km/h (2391 m travelled in 60 seconds) |
TIM:SAEIVGESTC.15 | Kerpotence |
|
computed speed between the stops is 130.33 km/h (6517 m travelled in 180 seconds) |
PENNARBED:2917912 | Auberge Neuve |
|
computed speed between the stops is 127.27 km/h (2121 m travelled in 60 seconds) |
Validation carried out using the current GTFS file the 2024-11-30 at 07:09 Europe/Paris using the PAN GTFS validator.