Resource details
File name:
KORRIGO
Format: GTFS
Size: 59.5 MB
Fichier GTFS
This resource file is part of the dataset Agrégat des réseaux urbains et interurbains de Bretagne.
It is valid from 2026-04-02 to 2026-12-31.
-
calendar span by network:MAT (St Malo Agglomération) from 2026-04-02 to 2026-04-05 STAR (Rennes Métropole) from 2026-04-02 to 2026-04-20 TUB (St Brieuc Agglomération) from 2026-04-02 to 2026-06-28 Izilo (Lorient Agglomération) from 2026-04-02 to 2026-06-28 Liaisons maritimes Morbihan from 2026-04-02 to 2026-06-30 TER BreizhGo from 2026-04-02 to 2026-07-01 Tud'Bus (Douarnenez Communauté) from 2026-04-02 to 2026-07-03 TILT (Lannion) from 2026-04-02 to 2026-07-03 Réseau Coralie (Concarneau Cornouaille Agglomération) from 2026-04-02 to 2026-07-03 PondiBUS et MOOVI (Pontivy) from 2026-04-02 to 2026-07-03 LinéotimL30 (Morlaix) from 2026-04-02 to 2026-07-03 Distribus (Lamballe Terre & Mer) from 2026-04-02 to 2026-07-03 BreizhGo en Morbihan from 2026-04-02 to 2026-07-03 BreizhGo en Ille-et-Vilaine from 2026-04-02 to 2026-07-03 BreizhGo en Finistère from 2026-04-02 to 2026-07-03 BreizhGo en Côtes d'Armor from 2026-04-02 to 2026-07-03 TBK (Quimperlé) from 2026-04-02 to 2026-07-04 Liaison maritime Arz from 2026-04-02 to 2026-07-05 Bibus (Brest Métropole) from 2026-04-02 to 2026-07-05 Ar Bus (Communauté de Communes du Pays de Landerneau-Daoulas) from 2026-04-02 to 2026-08-29 QUB (Quimper urbain) from 2026-04-02 to 2026-08-30 SURF (Fougères) from 2026-04-02 to 2026-08-31 RIV (Ploërmel) from 2026-04-02 to 2026-08-31 Glazgo mobilités (Auray Quiberon Terre Atlantique) from 2026-04-02 to 2026-08-31 Kicéo (Vannes Agglomération) from 2026-04-02 to 2026-11-16 Linéotim (Morlaix urbain) from 2026-04-02 to 2026-12-19 Linéotim (Morlaix périurbain) from 2026-04-02 to 2026-12-20 Liaisons maritimes Finistère from 2026-04-02 to 2026-12-31 Guingamp-Paimpol Mobilité from 2026-04-02 to 2026-12-31 Finist'Air from 2026-04-02 to 2026-12-31
- transport modes : bus, ferry, tramway, gondola, air, coach, rail, subway
- number of routes: 1,198
- number of stop points: 16,515
- number of stop areas: 0
The following table displays if the file/field is present in the GTFS.
| Description | File or field | Status | Quantity |
|---|---|---|---|
| Stop accessibility | stops.txt — wheelchair_boarding |
✅ | 5,246 |
| Trip accessibility | trips.txt — wheelchair_accessible |
✅ | 77,018 |
| Line short name or line number | routes.txt — route_short_name |
✅ | 1,112 |
| Line long name | routes.txt — route_long_name |
✅ | 1,198 |
| Line color | routes.txt — route_color |
✅ | 1,098 |
| Trip headsign | trips.txt — trip_headsign |
❌ | 0 |
| The possibility of carrying a bicycle in the vehicle | trips.txt — bikes_allowed |
❌ | 0 |
| Trip shapes | shapes.txt |
✅ | 94,966 |
| Fare attributes | fare_attributes.txt |
❌ | 0 |
| Fare rules | fare_rules.txt |
❌ | 0 |
| Fare products | fare_products.txt |
❌ | 0 |
| Fare media | fare_media.txt |
❌ | 0 |
| Transfers | transfers.txt |
✅ | 25,691 |
| On-demand transport | stop_times.txt — pickup_type, drop_off_type |
✅ |
Download availability
2026-03-03
100%
2026-03-04
100%
2026-03-05
100%
2026-03-06
100%
2026-03-07
100%
2026-03-08
100%
2026-03-09
100%
2026-03-10
100%
2026-03-11
100%
2026-03-12
100%
2026-03-13
100%
2026-03-14
100%
2026-03-15
100%
2026-03-16
100%
2026-03-17
100%
2026-03-18
100%
2026-03-19
100%
2026-03-20
100%
2026-03-21
100%
2026-03-22
100%
2026-03-23
100%
2026-03-24
100%
2026-03-25
100%
2026-03-26
100%
2026-03-27
100%
2026-03-28
100%
2026-03-29
100%
2026-03-30
100%
2026-03-31
100%
2026-04-01
100%
2026-04-02
100%
Learn more
We test this resource download availability every hour by making an HTTP
For SIRI and SIRI Lite feeds, we perform a
HEAD request with a timeout of 5 seconds. If we detect a downtime, we perform subsequent tests every 10 minutes, until the resource is back online.For SIRI and SIRI Lite feeds, we perform a
GET request: a 401 or 405 status code is considered successful. In case of HTTP 500, the feed will be considered unavailable, unless the body appears to contain SOAP.Stops and routes visualization of the GTFS file
Validation report
Impacted file: stop_times.txt
The speed between two consecutive stops do not seem credible
| Stop ID | Stop name | Next stop and service | Details |
|---|---|---|---|
| MAT:1380 | Le Clos au Coq |
|
computed speed between the stops is 183.55 km/h (3059 m travelled in 60 seconds) |
| MAT:1558 | Roblin |
|
computed speed between the stops is 188.70 km/h (6290 m travelled in 120 seconds) |
| CORALIE:StopPoint_CORNav253 | Toul Kar Furic |
|
computed speed between the stops is 125.03 km/h (2084 m travelled in 60 seconds) |
| LINEOTIMPERI:LoBOURG1 | Loc Eguiner Bourg |
|
computed speed between the stops is 64827.71 km/h (5402309 m travelled in 300 seconds) |
| MAT:1342 | La Touesse |
|
computed speed between the stops is 223.52 km/h (3725 m travelled in 60 seconds) |
| MAT:1521 | Gare |
|
computed speed between the stops is 199.57 km/h (9978 m travelled in 180 seconds) |
| LINEOTIMPERI:MxEZOLA2 | Émile Zola |
|
computed speed between the stops is 46405.50 km/h (5413975 m travelled in 420 seconds) |
| MAT:1389 | Le Fougeray |
|
computed speed between the stops is 342.34 km/h (5706 m travelled in 60 seconds) |
| LINEOTIMPERI:PsCroas1 | Croas Ar Salud |
|
computed speed between the stops is 81173.50 km/h (5411566 m travelled in 240 seconds) |
| PABMAR:4 | Gare maritime de BREST |
|
computed speed between the stops is 2794.03 km/h (46567 m travelled in 60 seconds) |
| LINEOTIMPERI:CaCHATE1 | Château d'Eau |
|
computed speed between the stops is 1138.78 km/h (18980 m travelled in 60 seconds) |
| CORALIE:StopPoint_CORNav29 | Sterenn |
|
computed speed between the stops is 146.51 km/h (2442 m travelled in 60 seconds) |
| TIM:chouette:StopArea:5df5bde0-9b3e-4468-8c40-99d3b2375f4b:LOC | Le Poteau |
|
computed speed between the stops is 267.59 km/h (4460 m travelled in 60 seconds) |
| KICEO:5614 | Le Poteau |
|
computed speed between the stops is 132.11 km/h (4404 m travelled in 120 seconds) |
| TIBUS:SJU3A1 | Centre |
|
computed speed between the stops is 124.46 km/h (2074 m travelled in 60 seconds) |
| LINEOTIM:SmMYRT2 | MYRTILLES |
|
computed speed between the stops is 162403.39 km/h (5413446 m travelled in 120 seconds) |
| MAT:1387 | Le Fedeuil |
|
computed speed between the stops is 334.26 km/h (5571 m travelled in 60 seconds) |
| PABMAR:2 | Gare maritime MOLENE |
|
computed speed between the stops is 625.11 km/h (10418 m travelled in 60 seconds) |
| TIBUS:SCS3A1 | Le Guildo - La Croix aux Merles |
|
computed speed between the stops is 323.12 km/h (5385 m travelled in 60 seconds) |
| LINEOTIMPERI:LpBOURG2 | Le Ponthou Bourg |
|
computed speed between the stops is 108230.23 km/h (5411511 m travelled in 180 seconds) |
Validation carried out using the current GTFS file the 2026-04-02 at 08:30 Europe/Paris using the PAN GTFS validator.