Resource details
File name : GTFS_haute_savoie.zip
This resource file is part of the dataset Réseau interurbain de la Haute-Savoie (74).
It is valid from 2024-05-20 to 2024-08-31.
-
network : REGION - cars Région Haute-Savoie
- transport mode : bus
- number of routes: 23
- number of stop points: 852
- number of stop areas: 471
The following table displays if the file/field is present in the GTFS.
Description | File or field | Status | Quantity |
---|---|---|---|
Stop accessibility | stops.txt — wheelchair_boarding |
❌ | 0 |
Trip accessibility | trips.txt — wheelchair_accessible |
❌ | 0 |
Line short name or line number | routes.txt — route_short_name |
✅ | 23 |
Line long name | routes.txt — route_long_name |
✅ | 23 |
Line color | routes.txt — route_color |
✅ | 22 |
Trip headsign | trips.txt — trip_headsign |
✅ | 617 |
The possibility of carrying a bicycle in the vehicle | trips.txt — bikes_allowed |
❌ | 0 |
Trip shapes | shapes.txt |
✅ | 617 |
Fare attributes | fare_attributes.txt |
❌ | 0 |
Fare rules | fare_rules.txt |
❌ | 0 |
Transfers | transfers.txt |
❌ | 0 |
On-demand transport | stop_times.txt — pickup_type , drop_off_type |
✅ |
This resource is also available in the following formats:
* GeoJSON format contains only the spatial information of the resource (stops coordinates, eventually lines shapes)
It corresponds to the data you can see on the map below.
This GeoJSON was up-to-date with the GTFS resource 5 h 9 min ago.
Download availability
2024-04-23
100%
2024-04-24
100%
2024-04-25
100%
2024-04-26
100%
2024-04-27
100%
2024-04-28
100%
2024-04-29
100%
2024-04-30
100%
2024-05-01
100%
2024-05-02
100%
2024-05-03
100%
2024-05-04
100%
2024-05-05
100%
2024-05-06
100%
2024-05-07
100%
2024-05-08
100%
2024-05-09
100%
2024-05-10
100%
2024-05-11
100%
2024-05-12
100%
2024-05-13
100%
2024-05-14
100%
2024-05-15
100%
2024-05-16
100%
2024-05-17
100%
2024-05-18
100%
2024-05-19
100%
2024-05-20
100%
2024-05-21
100%
2024-05-22
99.3%
2024-05-23
100%
Learn more
We test this resource download availability every hour by making an HTTPHEAD
request with a timeout of 5 seconds. If we detect a downtime, we perform subsequent tests every 10 minutes, until the resource is back online.For SIRI and SIRI Lite feeds, we perform a
GET
request: a 401 or 405 status code is considered successful.
Stops and routes visualization of the GTFS file
Visualization up-to-date 5 h 9 min ago.
Validation report
Impacted file: stop_times.txt
The speed between two consecutive stops do not seem credible
Stop ID | Stop name | Next stop and service | Details |
---|---|---|---|
0461B | SAINT ANDRE DE BOEGE Curseille |
|
computed speed between the stops is 124.02 km/h (2067 m travelled in 60 seconds) |
0273B | ALEX Rond Point |
|
computed speed between the stops is 154.07 km/h (2568 m travelled in 60 seconds) |
0149B | UGINE Soney |
|
computed speed between the stops is 226.85 km/h (3781 m travelled in 60 seconds) |
0522B | TANINGES Verdevant |
|
computed speed between the stops is 188.48 km/h (3141 m travelled in 60 seconds) |
0141B | GIEZ Gare |
|
computed speed between the stops is 169.19 km/h (2820 m travelled in 60 seconds) |
0320C | ANNECY Le Rabelais |
|
computed speed between the stops is 127.14 km/h (2119 m travelled in 60 seconds) |
0141C | GIEZ Gare |
|
computed speed between the stops is 149.65 km/h (2494 m travelled in 60 seconds) |
0135B | DOUSSARD Bout du Lac |
|
computed speed between the stops is 127.41 km/h (2124 m travelled in 60 seconds) |
0140C | DOUSSARD Ancienne Gare |
|
computed speed between the stops is 168.72 km/h (2812 m travelled in 60 seconds) |
0331C | MUSIEGES Serrasson |
|
computed speed between the stops is 141.39 km/h (2357 m travelled in 60 seconds) |
Validation carried out using the current GTFS file the 2024-05-22 at 14:07 Europe/Paris using the PAN GTFS validator.