Resource details

File name: Horaires Flixbus Europe
Format: GTFS
Size: 50.36 MB

Fichier contenant les horaires de l’ensemble du réseau de transport Européen Flixbus

This resource file is part of the dataset Réseau européen FlixBus et FlixTrain.

It is valid from 2025-09-21 to 2026-03-20.

  • calendar span by network:
    FlixTrain-eu from 2025-09-21 to 2026-03-20 FlixBus-eu from 2025-09-21 to 2026-03-20
  • transport modes : bus, rail
  • number of routes: 1,066
  • number of stop points: 2,030
  • number of stop areas: 0

The following table displays if the file/field is present in the GTFS.

Description File or field Status Quantity
Stop accessibility stops.txtwheelchair_boarding 0
Trip accessibility trips.txtwheelchair_accessible 0
Line short name or line number routes.txtroute_short_name 1,066
Line long name routes.txtroute_long_name 1,066
Line color routes.txtroute_color 1,066
Trip headsign trips.txttrip_headsign 0
The possibility of carrying a bicycle in the vehicle trips.txtbikes_allowed 0
Trip shapes shapes.txt 31,977
Fare attributes fare_attributes.txt 0
Fare rules fare_rules.txt 0
Transfers transfers.txt 2,052
On-demand transport stop_times.txtpickup_type, drop_off_type
This resource is also available in the following formats: * GeoJSON format contains only the spatial information of the resource (stops coordinates, eventually lines shapes) It corresponds to the data you can see on the map below. This GeoJSON was up-to-date with the GTFS resource 3 hours and 9 minutes ago.

Download availability

2025-08-27
100%
2025-08-28
100%
2025-08-29
100%
2025-08-30
100%
2025-08-31
100%
2025-09-01
100%
2025-09-02
100%
2025-09-03
100%
2025-09-04
100%
2025-09-05
100%
2025-09-06
100%
2025-09-07
100%
2025-09-08
100%
2025-09-09
100%
2025-09-10
100%
2025-09-11
100%
2025-09-12
100%
2025-09-13
100%
2025-09-14
100%
2025-09-15
100%
2025-09-16
100%
2025-09-17
100%
2025-09-18
100%
2025-09-19
100%
2025-09-20
100%
2025-09-21
100%
2025-09-22
100%
2025-09-23
100%
2025-09-24
100%
2025-09-25
100%
2025-09-26
100%
Learn more
We test this resource download availability every hour by making an HTTP HEAD request with a timeout of 5 seconds. If we detect a downtime, we perform subsequent tests every 10 minutes, until the resource is back online.

For SIRI and SIRI Lite feeds, we perform a GET request: a 401 or 405 status code is considered successful. In case of HTTP 500, the feed will be considered unavailable, unless the body appears to contain SOAP.

Stops and routes visualization of the GTFS file

Visualization up-to-date 3 hours and 9 minutes ago.

Validation report

Impacted file: shapes.txt

Some shapes defined in shapes.txt are not used in trips.txt

Shape ID
7c6c6cce10b0939d44093b9a4e3f1481
167717faf39874ffea5f94f987ee1a73
9d0e891e4e0b54cc17ae6547dfaa0468
8e86ee4fe30baffe123bae9f746beb7d
155c2b67143cd6772070ac0bb001a18b
67b5be70886bca7fa9b2f778d573be89
507abf4f9074d2f5d1fa5abc1d4ac67c
c53d58a1701a5b5aaae862b95b27fcce
29f83439caa1714ccc3983e95a0a74fa
e2737608522fc9d3a35043921ef95e79
997eb10cda857e376112a930450d788a
a4b8affa93708f52d7e3003844946aaa
ac1f462cf109a70acfaa688645aa54d0
99edb4300fec6fc56a80f13e7985d4c1
1ffb576fb4c5dda9a35aa1925abedbaa
c2599514235eefb5851aac6ace4e0ba7
9d0ed94a0a81209bbda67b5c772b1acd
10bf7fc50b51592f5bd439032109a2e6
a540b4e0ec5b4aa6a0fca2c95cd634cd
92f0cfd5a4070228a840fdafdbcd58a6

Validation carried out using the current GTFS file the 2025-09-22 at 17:45 Europe/Paris using the PAN GTFS validator.