Resource details
File name:
Export au format CSV
Format: GTFS
Size: 4.37 MB
- ID: id[text]
- Description: description[text]
- Début de validité: debutvalidite[date]
- Fin de validité: finvalidite[date]
- Fichier: fichier[file]
- URL: url[text]
- Taille (en octets): tailleoctets[int]
- Publication: publication[datetime]
This resource file is part of the dataset Réseau urbain STAR.
It is valid from 2025-02-03 to 2025-02-09.
-
network : STAR
- transport modes : subway, bus
- number of routes: 153
- number of stop points: 1,771
- number of stop areas: 28
The following table displays if the file/field is present in the GTFS.
Description | File or field | Status | Quantity |
---|---|---|---|
Stop accessibility | stops.txt — wheelchair_boarding |
✅ | 1,792 |
Trip accessibility | trips.txt — wheelchair_accessible |
✅ | 37,415 |
Line short name or line number | routes.txt — route_short_name |
✅ | 153 |
Line long name | routes.txt — route_long_name |
✅ | 153 |
Line color | routes.txt — route_color |
✅ | 152 |
Trip headsign | trips.txt — trip_headsign |
✅ | 37,274 |
The possibility of carrying a bicycle in the vehicle | trips.txt — bikes_allowed |
❌ | 0 |
Trip shapes | shapes.txt |
✅ | 11,634 |
Fare attributes | fare_attributes.txt |
✅ | 1 |
Fare rules | fare_rules.txt |
❌ | 0 |
Transfers | transfers.txt |
❌ | 0 |
On-demand transport | stop_times.txt — pickup_type , drop_off_type |
❌ |
This resource is also available in the following formats:
* GeoJSON format contains only the spatial information of the resource (stops coordinates, eventually lines shapes)
It corresponds to the data you can see on the map below.
This GeoJSON was up-to-date with the GTFS resource 4 hours and 25 minutes ago.
Download availability
2025-01-01
100%
2025-01-02
100%
2025-01-03
100%
2025-01-04
100%
2025-01-05
100%
2025-01-06
100%
2025-01-07
100%
2025-01-08
100%
2025-01-09
100%
2025-01-10
100%
2025-01-11
100%
2025-01-12
100%
2025-01-13
100%
2025-01-14
100%
2025-01-15
100%
2025-01-16
100%
2025-01-17
100%
2025-01-18
100%
2025-01-19
100%
2025-01-20
100%
2025-01-21
100%
2025-01-22
100%
2025-01-23
100%
2025-01-24
100%
2025-01-25
100%
2025-01-26
100%
2025-01-27
100%
2025-01-28
100%
2025-01-29
100%
2025-01-30
100%
2025-01-31
100%
Learn more
We test this resource download availability every hour by making an HTTP
For SIRI and SIRI Lite feeds, we perform a
HEAD
request with a timeout of 5 seconds. If we detect a downtime, we perform subsequent tests every 10 minutes, until the resource is back online.For SIRI and SIRI Lite feeds, we perform a
GET
request: a 401 or 405 status code is considered successful. In case of HTTP 500, the feed will be considered unavailable, unless the body appears to contain SOAP.Stops and routes visualization of the GTFS file
Visualization up-to-date 4 hours and 25 minutes ago.
Validation report
Impacted file: stop_times.txt
The speed between two consecutive stops do not seem credible
Stop ID | Stop name | Next stop and service | Details |
---|---|---|---|
5-1655 | Motte Brûlon |
|
computed speed between the stops is 937.88 km/h (261 m travelled in 1 seconds) |
5-2022 | Sports et Nature |
|
computed speed between the stops is 667.00 km/h (185 m travelled in 1 seconds) |
5-4011 | Foyer |
|
computed speed between the stops is 742.24 km/h (206 m travelled in 1 seconds) |
5-2456 | Pont Brand |
|
computed speed between the stops is 1394.98 km/h (387 m travelled in 1 seconds) |
5-1258 | Houx Cité U |
|
computed speed between the stops is 554.67 km/h (154 m travelled in 1 seconds) |
5-1335 | Ormeaux |
|
computed speed between the stops is 543.85 km/h (151 m travelled in 1 seconds) |
5-1081 | Bourgeois |
|
computed speed between the stops is 985.94 km/h (274 m travelled in 1 seconds) |
5-1176 | Beaulieu INSA |
|
computed speed between the stops is 1035.97 km/h (288 m travelled in 1 seconds) |
5-3707 | Pont aux Moines |
|
computed speed between the stops is 1487.29 km/h (413 m travelled in 1 seconds) |
5-2803 | La Plesse |
|
computed speed between the stops is 883.27 km/h (245 m travelled in 1 seconds) |
5-3103 | Docteur Léon |
|
computed speed between the stops is 1153.17 km/h (320 m travelled in 1 seconds) |
5-1211 | Serpette |
|
computed speed between the stops is 998.69 km/h (277 m travelled in 1 seconds) |
5-4403 | Bouvrais |
|
computed speed between the stops is 490.59 km/h (136 m travelled in 1 seconds) |
5-2716 | Petit Beaulieu |
|
computed speed between the stops is 2035.59 km/h (565 m travelled in 1 seconds) |
5-2237 | Aire Libre |
|
computed speed between the stops is 1286.04 km/h (357 m travelled in 1 seconds) |
5-1403 | Saint-Exupéry |
|
computed speed between the stops is 889.85 km/h (247 m travelled in 1 seconds) |
5-1293 | Guilloux |
|
computed speed between the stops is 773.51 km/h (215 m travelled in 1 seconds) |
5-2010 | Mare Pavée |
|
computed speed between the stops is 717.78 km/h (199 m travelled in 1 seconds) |
5-4555 | Saint-Armel Gare |
|
computed speed between the stops is 1125.27 km/h (313 m travelled in 1 seconds) |
5-3250 | Orgerblon |
|
computed speed between the stops is 886.32 km/h (246 m travelled in 1 seconds) |
Validation carried out using the current GTFS file the 2025-01-29 at 07:22 Europe/Paris using the PAN GTFS validator.