Resource details
File name:
Export au format CSV
Format: GTFS
Size: 7.59 MB
- ID: id[text]
- Description: description[text]
- Début de validité: debutvalidite[date]
- Fin de validité: finvalidite[date]
- Fichier: fichier[file]
- URL: url[text]
- Taille (en octets): tailleoctets[int]
- Publication: publication[datetime]
This resource file is part of the dataset Réseau urbain STAR.
It is valid from 2024-12-23 to 2025-01-05.
-
network : STAR
- transport modes : subway, bus
- number of routes: 61
- number of stop points: 1,528
- number of stop areas: 28
The following table displays if the file/field is present in the GTFS.
Description | File or field | Status | Quantity |
---|---|---|---|
Stop accessibility | stops.txt — wheelchair_boarding |
✅ | 1,556 |
Trip accessibility | trips.txt — wheelchair_accessible |
✅ | 54,740 |
Line short name or line number | routes.txt — route_short_name |
✅ | 61 |
Line long name | routes.txt — route_long_name |
✅ | 61 |
Line color | routes.txt — route_color |
✅ | 60 |
Trip headsign | trips.txt — trip_headsign |
✅ | 54,646 |
The possibility of carrying a bicycle in the vehicle | trips.txt — bikes_allowed |
❌ | 0 |
Trip shapes | shapes.txt |
✅ | 54,740 |
Fare attributes | fare_attributes.txt |
✅ | 1 |
Fare rules | fare_rules.txt |
❌ | 0 |
Transfers | transfers.txt |
❌ | 0 |
On-demand transport | stop_times.txt — pickup_type , drop_off_type |
❌ |
This resource is also available in the following formats:
* GeoJSON format contains only the spatial information of the resource (stops coordinates, eventually lines shapes)
It corresponds to the data you can see on the map below.
This GeoJSON was up-to-date with the GTFS resource 59 hours and 55 minutes ago.
Download availability
2024-11-23
100%
2024-11-24
100%
2024-11-25
100%
2024-11-26
100%
2024-11-27
100%
2024-11-28
100%
2024-11-29
100%
2024-11-30
100%
2024-12-01
100%
2024-12-02
100%
2024-12-03
100%
2024-12-04
100%
2024-12-05
100%
2024-12-06
100%
2024-12-07
100%
2024-12-08
100%
2024-12-09
100%
2024-12-10
100%
2024-12-11
100%
2024-12-12
100%
2024-12-13
100%
2024-12-14
100%
2024-12-15
100%
2024-12-16
100%
2024-12-17
100%
2024-12-18
100%
2024-12-19
100%
2024-12-20
100%
2024-12-21
100%
2024-12-22
100%
2024-12-23
100%
Learn more
We test this resource download availability every hour by making an HTTP
For SIRI and SIRI Lite feeds, we perform a
HEAD
request with a timeout of 5 seconds. If we detect a downtime, we perform subsequent tests every 10 minutes, until the resource is back online.For SIRI and SIRI Lite feeds, we perform a
GET
request: a 401 or 405 status code is considered successful. In case of HTTP 500, the feed will be considered unavailable, unless the body appears to contain SOAP.Stops and routes visualization of the GTFS file
Visualization up-to-date 59 hours and 55 minutes ago.
Validation report
Impacted file: stop_times.txt
The speed between two consecutive stops do not seem credible
Stop ID | Stop name | Next stop and service | Details |
---|---|---|---|
5-2028 | La Coulée |
|
computed speed between the stops is 944.57 km/h (262 m travelled in 1 seconds) |
5-2864 | Cerisaie |
|
computed speed between the stops is 1060.48 km/h (295 m travelled in 1 seconds) |
5-1041 | Trois Croix |
|
computed speed between the stops is 867.71 km/h (241 m travelled in 1 seconds) |
5-2808 | Uttenreuth |
|
computed speed between the stops is 1017.16 km/h (283 m travelled in 1 seconds) |
5-1665 | Atalante Champeaux |
|
computed speed between the stops is 713.88 km/h (198 m travelled in 1 seconds) |
5-1156 | Le Blizz |
|
computed speed between the stops is 1248.60 km/h (347 m travelled in 1 seconds) |
5-2025 | Maison d'Accueil |
|
computed speed between the stops is 715.23 km/h (199 m travelled in 1 seconds) |
5-1418 | Géniaux |
|
computed speed between the stops is 1101.26 km/h (306 m travelled in 1 seconds) |
5-1068 | Gohier |
|
computed speed between the stops is 893.97 km/h (248 m travelled in 1 seconds) |
5-2022 | Sports et Nature |
|
computed speed between the stops is 667.00 km/h (185 m travelled in 1 seconds) |
5-2161 | Rigourdière |
|
computed speed between the stops is 877.38 km/h (244 m travelled in 1 seconds) |
5-1500 | Agrocampus |
|
computed speed between the stops is 1144.93 km/h (318 m travelled in 1 seconds) |
5-4269 | Place de la Mairie |
|
computed speed between the stops is 589.08 km/h (164 m travelled in 1 seconds) |
5-2836 | Uttenreuth |
|
computed speed between the stops is 939.01 km/h (261 m travelled in 1 seconds) |
5-1172 | Robidou |
|
computed speed between the stops is 816.85 km/h (227 m travelled in 1 seconds) |
5-1392 | Montand |
|
computed speed between the stops is 567.65 km/h (158 m travelled in 1 seconds) |
5-1060 | Piré |
|
computed speed between the stops is 1239.57 km/h (344 m travelled in 1 seconds) |
5-4301 | Hautière |
|
computed speed between the stops is 1102.80 km/h (306 m travelled in 1 seconds) |
5-1293 | Guilloux |
|
computed speed between the stops is 773.51 km/h (215 m travelled in 1 seconds) |
5-1335 | Ormeaux |
|
computed speed between the stops is 543.85 km/h (151 m travelled in 1 seconds) |
Validation carried out using the current GTFS file the 2024-12-20 at 01:11 Europe/Paris using the PAN GTFS validator.