Resource details
GTFS-RT (protobuff) des perturbations.
This resource file is part of the dataset Réseau urbain MOCA.
Download availability
Learn more
HEAD request with a timeout of 5 seconds. If we detect a downtime, we perform subsequent tests every 10 minutes, until the resource is back online.For SIRI and SIRI Lite feeds, we perform a
GET request: a 401 or 405 status code is considered successful. In case of HTTP 500, the feed will be considered unavailable, unless the body appears to contain SOAP.Validation details
❌1 error
Validation carried out using the current GTFS file and the GTFS-RT the 2026-07-16 at 09:03 Europe/Paris using the MobilityData GTFS-RT validator.
Errors
GTFS-rt stop_id does not exist in GTFS data E011 1 error
All stop_ids referenced in GTFS-rt feeds must exist in GTFS stops.txt
Sample errors
- alert entity ID alert:6a54f7f679f5b9d0efe88e04 stop_id 30030 does not exist in GTFS data stops.txt
Previous validations
Here is a recap of all the error types encountered over the last 30 days.
| Error ID | Description | Errors count | Number of occurences |
|---|---|---|---|
| E011 | All stop_ids referenced in GTFS-rt feeds must exist in GTFS stops.txt | 3 | 3 times (10 % of validations) |
GTFS-RT feed content
Entities
Entities present in this feed at 2026-07-17 at 04:58 Europe/Paris.
service_alerts (2) vehicle_positions (0) trip_updates (0)Entities seen in the last 7 days.
service_alertsService alerts
Here is a display of service alerts contained in this feed at 2026-07-17 at 04:58 Europe/Paris.
déviation Moca 1 et 2 Detour
Enraison de travaux de réfection des canalisations d'eau potable sur la ruePierre et Marie Curie de Barentin, la rue est fermée dans le sensdescendant, Leslignes 1 et2 seront déviées parl’avenue Aristide Briand dans le sens zone commerciale direction Pavilly etVillers-Ecalles
Between 2026-07-10 at 00:00 Europe/Paris and 2026-08-14 at 23:59 Europe/Paris
travaux rue Freckenhorst Pavilly Stop moved
A partir de mercredi 15 juillet 2026. Enraison de travaux de réfection sur la rue de Freckenhorst à Pavilly, «l’arrêt Freckenhorst » est reporté 100 mètres plus hautpour faciliter la circulation en alterna mise en place.
Between 2026-07-13 at 00:00 Europe/Paris and 2026-07-31 at 23:59 Europe/Paris
Decoded GTFS-RT feed
See full payload
Here is the decoded GTFS-RT feed Protobuf at 2026-07-17 at 04:58 Europe/Paris. You can look at the GTFS-RT documentation.
{
"entity": [
{
"alert": {
"activePeriod": [
{
"end": "1786744740",
"start": "1783634400"
}
],
"cause": "CONSTRUCTION",
"descriptionText": {
"translation": [
{
"text": "Enraison de travaux de réfection des canalisations d'eau potable sur la ruePierre et Marie Curie de Barentin, la rue est fermée dans le sensdescendant, \n\nLeslignes 1 et2 seront déviées parl’avenue Aristide Briand dans le sens zone commerciale direction Pavilly etVillers-Ecalles"
}
]
},
"effect": "DETOUR",
"headerText": {
"translation": [
{
"text": "déviation Moca 1 et 2"
}
]
},
"informedEntity": [
{
"routeId": "1"
},
{
"routeId": "2"
}
]
},
"id": "alert:6a4b4d351837db300139131a"
},
{
"alert": {
"activePeriod": [
{
"end": "1785535140",
"start": "1783893600"
}
],
"cause": "CONSTRUCTION",
"descriptionText": {
"translation": [
{
"text": "A partir de mercredi 15 juillet 2026.\n\nEnraison de travaux de réfection sur la rue de Freckenhorst à Pavilly, «l’arrêt Freckenhorst » est reporté 100 mètres plus hautpour faciliter la circulation en alterna mise en place."
}
]
},
"effect": "STOP_MOVED",
"headerText": {
"translation": [
{
"text": "travaux rue Freckenhorst Pavilly"
}
]
},
"informedEntity": [
{
"stopId": "30030"
}
]
},
"id": "alert:6a54f7f679f5b9d0efe88e04"
}
],
"header": {
"gtfsRealtimeVersion": "2.0",
"timestamp": "1784257094"
}
}