Resource details
File name : gtfs-nord-rtm.zip
Lignes urbaines de la zone nord de la Martinique
This resource file is part of the dataset Réseau urbain de la zone Nord (CAP NORD).
It is valid from 2023-12-27 to 2024-06-30.
-
network : Reseau Nord
- transport mode : bus
- number of routes: 54
- number of stop points: 2,000
- number of stop areas: 1,353
The following table displays if the file/field is present in the GTFS.
Description | File or field | Status | Quantity |
---|---|---|---|
Stop accessibility | stops.txt — wheelchair_boarding |
❌ | 0 |
Trip accessibility | trips.txt — wheelchair_accessible |
❌ | 0 |
Line short name or line number | routes.txt — route_short_name |
✅ | 54 |
Line long name | routes.txt — route_long_name |
✅ | 54 |
Line color | routes.txt — route_color |
✅ | 54 |
Trip headsign | trips.txt — trip_headsign |
✅ | 2,296 |
The possibility of carrying a bicycle in the vehicle | trips.txt — bikes_allowed |
❌ | 0 |
Trip shapes | shapes.txt |
✅ | 2,296 |
Fare attributes | fare_attributes.txt |
❌ | 0 |
Fare rules | fare_rules.txt |
❌ | 0 |
Transfers | transfers.txt |
❌ | 0 |
On-demand transport | stop_times.txt — pickup_type , drop_off_type |
❌ |
This resource is also available in the following formats:
* GeoJSON format contains only the spatial information of the resource (stops coordinates, eventually lines shapes)
It corresponds to the data you can see on the map below.
This GeoJSON was up-to-date with the GTFS resource 5 h 28 min ago.
Download availability
2024-04-21
100%
2024-04-22
100%
2024-04-23
100%
2024-04-24
100%
2024-04-25
100%
2024-04-26
100%
2024-04-27
100%
2024-04-28
100%
2024-04-29
100%
2024-04-30
100%
2024-05-01
100%
2024-05-02
100%
2024-05-03
100%
2024-05-04
100%
2024-05-05
100%
2024-05-06
100%
2024-05-07
100%
2024-05-08
100%
2024-05-09
100%
2024-05-10
100%
2024-05-11
100%
2024-05-12
100%
2024-05-13
97.6%
2024-05-14
100%
2024-05-15
100%
2024-05-16
100%
2024-05-17
100%
2024-05-18
100%
2024-05-19
100%
2024-05-20
100%
2024-05-21
100%
Learn more
We test this resource download availability every hour by making an HTTPHEAD
request with a timeout of 5 seconds. If we detect a downtime, we perform subsequent tests every 10 minutes, until the resource is back online.For SIRI and SIRI Lite feeds, we perform a
GET
request: a 401 or 405 status code is considered successful.
Stops and routes visualization of the GTFS file
Visualization up-to-date 5 h 28 min ago.
Validation report
Impacted file: stop_times.txt
The speed between two consecutive stops do not seem credible
Stop ID | Stop name | Next stop and service | Details |
---|---|---|---|
23396 | INTERSECTION CHEMIN MAGNAN - CHEMIN PETIT GOU |
|
computed speed between the stops is 131.31 km/h (365 m travelled in 10 seconds) |
23398 | CHEMIN MAGNAN PV 3 |
|
computed speed between the stops is 140.11 km/h (195 m travelled in 5 seconds) |
21658 | Lotissement Brin d'Amour |
|
computed speed between the stops is 120.19 km/h (401 m travelled in 12 seconds) |
21660 | Morne Poirier |
|
computed speed between the stops is 126.79 km/h (387 m travelled in 11 seconds) |
23397 | INTERSECTION CHEMIN MAGNAN - CHEMIN CLARA BUL |
|
computed speed between the stops is 137.88 km/h (115 m travelled in 3 seconds) |
23400 | INTERSECTION CHEMIN MAGNAN - CROIX ODILON |
|
computed speed between the stops is 129.87 km/h (108 m travelled in 3 seconds) |
21669 | Cité Belle étoile 2 |
|
computed speed between the stops is 121.18 km/h (505 m travelled in 15 seconds) |
Validation carried out using the current GTFS file the 2024-02-29 at 15:32 Europe/Paris using the PAN GTFS validator.