Resource details

File name: GTFS
Format: GTFS
Size: 2.91 MB

This resource file is part of the dataset Réseau interurbain du Puy-de-Dôme (63).

It is valid from 2025-02-25 to 2025-08-31.

  • calendar span by network:
    Panoramique des Dômes from 2025-02-25 to 2025-06-30 REGION - cars Région Puy-de-Dôme from 2025-02-25 to 2025-07-05 DOME from 2025-02-25 to 2025-08-31
  • transport modes : bus, rail
  • number of routes: 39
  • number of stop points: 375
  • number of stop areas: 370

The following table displays if the file/field is present in the GTFS.

Description File or field Status Quantity
Stop accessibility stops.txtwheelchair_boarding 741
Trip accessibility trips.txtwheelchair_accessible 0
Line short name or line number routes.txtroute_short_name 39
Line long name routes.txtroute_long_name 39
Line color routes.txtroute_color 39
Trip headsign trips.txttrip_headsign 434
The possibility of carrying a bicycle in the vehicle trips.txtbikes_allowed 0
Trip shapes shapes.txt 434
Fare attributes fare_attributes.txt 0
Fare rules fare_rules.txt 0
Transfers transfers.txt 0
On-demand transport stop_times.txtpickup_type, drop_off_type
This resource is also available in the following formats: * GeoJSON format contains only the spatial information of the resource (stops coordinates, eventually lines shapes) It corresponds to the data you can see on the map below. This GeoJSON was up-to-date with the GTFS resource 2 hours and 35 minutes ago.

Download availability

2025-03-09
100%
2025-03-10
100%
2025-03-11
100%
2025-03-12
100%
2025-03-13
100%
2025-03-14
100%
2025-03-15
100%
2025-03-16
100%
2025-03-17
100%
2025-03-18
100%
2025-03-19
100%
2025-03-20
100%
2025-03-21
100%
2025-03-22
100%
2025-03-23
100%
2025-03-24
100%
2025-03-25
100%
2025-03-26
100%
2025-03-27
100%
2025-03-28
100%
2025-03-29
100%
2025-03-30
100%
2025-03-31
100%
2025-04-01
100%
2025-04-02
100%
2025-04-03
100%
2025-04-04
100%
2025-04-05
100%
2025-04-06
100%
2025-04-07
100%
2025-04-08
100%
Learn more
We test this resource download availability every hour by making an HTTP HEAD request with a timeout of 5 seconds. If we detect a downtime, we perform subsequent tests every 10 minutes, until the resource is back online.

For SIRI and SIRI Lite feeds, we perform a GET request: a 401 or 405 status code is considered successful. In case of HTTP 500, the feed will be considered unavailable, unless the body appears to contain SOAP.

Stops and routes visualization of the GTFS file

Visualization up-to-date 2 hours and 35 minutes ago.

Validation report

Impacted file: stop_times.txt

The speed between two consecutive stops do not seem credible

Stop ID Stop name Next stop and service Details
StopPoint:C6363-06584A Centre bourg
  • Les Baraques (StopPoint:C6363-07602A)
  • Saint-Eloy-les-Mines - Clermont-Ferrand (C63LRP61)
computed speed between the stops is 134.79 km/h (4493 m travelled in 120 seconds)
StopPoint:C6363-05343A Place de la Poste
  • Gare de Laqueuille (StopPoint:C6363-05280A)
  • Clermont-Ferrand - Le-Mont-Dore - Ussel (C63LRP46)
computed speed between the stops is 133.99 km/h (11166 m travelled in 300 seconds)
StopPoint:C6363-05332A Pont d'Olby
  • Le Lery (StopPoint:C6363-05334A)
  • Bourg-Lastic - Clermont-Ferrand (C63LRP52)
computed speed between the stops is 148.94 km/h (2482 m travelled in 60 seconds)

Validation carried out using the current GTFS file the 2025-02-27 at 13:10 Europe/Paris using the PAN GTFS validator.